2023-2025

MWA

Samrong Project

Construction of a 20,000 m³ clear-water reservoir at Samrong pumping station and associated works, under the 9th Water Supply Improvement Master Plan

฿523M

Project value

230,000 m³/day (station)

Treatment capacity

250 m

Pipe transmission

2,500 mm

Largest pipe

the challenge

Work sat inside a live pumping station. Deep sheet piling and excavation had to proceed without damaging existing systems or interrupting public supply.

what we delivered

A 20,000 m³ clear-water reservoir, a 0.2 m³/min submersible pump, lighting and power systems, plus tie-ins to the existing reservoir, chlorine building and mains.

how it was built

Pipe installed by sheet-pile-supported open-cut over 250 m: 175 m of 2,500 mm steel main and 75 m of 2,200 mm steel main.

Impact

Added clear-water reserve capacity, strengthened MWA pumping resilience, and supported rising urban demand.

20,000 m³ clear-water reservoir building

Automatic end-of-line chlorine dosing building

Inlet chamber linking existing and new reservoirs

Tie-in of the 2,000 mm transmission main

©2026 Dynamic Group Products

02-521-5611

info@dynamicgroup.co.th

©2026 Dynamic Group Products

02-521-5611

info@dynamicgroup.co.th

©2026 Dynamic Group Products

02-521-5611

info@dynamicgroup.co.th