the challenge
Upgrade the existing plant and expand production to keep pace with rising annual demand under PWA’s plan.
what we delivered
Mae Tae raw-water station, Mae Faek treatment works at 48,000 m³/day, and 35,878 m of water mains.
how it was built
Pipe installed by HDD, pipe jacking and open-cut, with mechanical, electrical, chemical dosing and remote-control systems.
Impact
Enough added capacity to meet demand, with higher treatment quality from the upgraded plant.

Water treatment system testing

Sedimentation tank construction

Grit chamber construction

Site pipework installation