2011-2013

PWA

Suphanburi Project

Water supply expansion, PWA Suphanburi branch, Mueang District, Suphanburi

฿340M

Project value

24,000 m³/day

Treatment capacity

31 km

Pipe transmission

700 mm

Largest pipe

the challenge

Urban growth in Suphanburi raised household demand. Production had to expand and water quality improve in time for that growth.

what we delivered

A 24,000 m³/day plant at Wang Yang, a 10,000 m³ reservoir, a 500 m³ elevated tower, existing-plant upgrade, plus mechanical, electrical and control works.

how it was built

Pipe by HDD, pipe jacking and open-cut over 31 km — 14 km HDPE, 1 km steel, 2 km GRP, 13 km PVC and 1 km A/C.

Impact

Enough production capacity for demand, with stronger household water security.