2020-2024

Provincial Waterworks Authority (PWA)

Future Park Project

Main replacement along Rangsit–Nakhon Nayok Road from Future Park Rangsit to Klong 5, Prachatipat and Bueng Yitho, Thanyaburi, Pathumthani

฿453M

Project value

Treatment capacity

10,000 m

Pipe transmission

1,500 mm

Largest pipe

the challenge

Works ran through dense community and traffic corridors, requiring traffic plans before each entry. Tie-ins to a large existing main needed multi-party coordination at every point.

what we delivered

A renewed transmission alignment that reduces leaks from the old main and upsizes capacity for community growth.

how it was built

1,200 mm pipe by open-cut and HDD, plus 1,500 mm steel-casing pipe jacking — about 10,000 m in total.

Impact

Higher transmission capacity and more reliable supply in Thanyaburi.

Open-cut pipe laying

Open-cut pipe laying

Pipe welding

HDD work

©2026 Dynamic Group Products

02-521-5611

info@dynamicgroup.co.th

©2026 Dynamic Group Products

02-521-5611

info@dynamicgroup.co.th

©2026 Dynamic Group Products

02-521-5611

info@dynamicgroup.co.th