2019-2021

PWA

Lat Lum Kaeo Project

Water supply improvement and expansion, PWA Pathumthani branch, Mueang–Sam Khok–Lat Lum Kaeo, Pathumthani — Part 2

฿425M

Project value

28,800 m³/day

Treatment capacity

98,516 m

Pipe transmission

900 mm

Largest pipe

the challenge

The alignment overlapped a PTT oil pipeline, requiring continuous coordination. Meter tie-ins in a dense, irregular community also demanded high precision.

what we delivered

Lat Lum Kaeo treatment and distribution facilities with production systems and transmission mains — from plant to customer supply.

how it was built

Open-cut 93,797 m, HDD HDPE pulls 4,177 m, and steel-casing pipe jacking 542 m, plus construction of the treatment and distribution works.

Impact

Production and supply to low-pressure zones across Lat Lum Kaeo and central Pathumthani.

Pipe laying

Electrical control building

Chlorine gas storage and dosing building

©2026 Dynamic Group Products

02-521-5611

info@dynamicgroup.co.th

©2026 Dynamic Group Products

02-521-5611

info@dynamicgroup.co.th

©2026 Dynamic Group Products

02-521-5611

info@dynamicgroup.co.th