2025-2027

PWA

Chiang Rai Project

Water supply improvement and expansion, PWA Mae Sai–(Huai Takhrai)–(Mae Chan)–(Chiang Saen) branches, Chiang Rai

฿976M

Project value

24,000 m³/day

Treatment capacity

62 km

Pipe transmission

630 mm

Largest pipe

the challenge

Meet demand in the existing service area and the Chiang Rai Special Economic Development Zone by expanding production and distribution across Mae Sai, Mae Chan and Chiang Saen.

what we delivered

Scope covers a Mekong raw-water intake, Chiang Saen 2 treatment plant, Pa Sak, Chan Chwa and Pong Ngam distribution stations, Mae Chan service unit, 62 km of mains, and automation systems.

how it was built

Pipe by HDD, pipe jacking and open-cut over 62 km — including steel 600 mm (19.7 km), multiple HDPE sizes, HDD 400–630 mm, and 0.50 km of pontoon-weighted HDPE 630 mm.

Impact

Addresses household water shortages across Mae Sai, Mae Chan and Chiang Saen, with supply planned for the next 10 years.

©2026 Dynamic Group Products

02-521-5611

info@dynamicgroup.co.th

©2026 Dynamic Group Products

02-521-5611

info@dynamicgroup.co.th

©2026 Dynamic Group Products

02-521-5611

info@dynamicgroup.co.th