2022-2026

Pattaya City

Na Jomtien Beachfront

Na Jomtien beachfront improvement, Pattaya City, Bang Lamung District, Chonburi

฿209M

Project value

Treatment capacity

2,000 mm: 2,421 m / 1,500 mm: 848 m

Pipe transmission

Steel-reinforced HDPE 2,000 mm

Largest pipe

the challenge

Beachfront and tourism-area works with heavy traffic, limited space, and the need to restore stormwater drainage quickly with minimal disruption to public use.

what we delivered

A faster beachfront stormwater system, with landscaping, footpaths, lighting and a drainage structure at the boat ramp.

how it was built

Steel-reinforced HDPE 1,500 mm laid by open-cut from Dongtan curve to Soi Jomtien 7, then 2,000 mm to Chaiyaphruek junction — with a drainage structure at the Dewari boat ramp.

Impact

Faster stormwater drainage, less standing water on the beachfront, and an improved visitor landscape.

Open-cut steel-reinforced HDPE drainage pipe

Concrete footpath paving

Street-lighting control panels

High-mast lighting upgrade

©2026 Dynamic Group Products

02-521-5611

info@dynamicgroup.co.th

©2026 Dynamic Group Products

02-521-5611

info@dynamicgroup.co.th

©2026 Dynamic Group Products

02-521-5611

info@dynamicgroup.co.th