2014-2016

PWA

Saraburi Project

Water supply improvement and expansion, PWA Phra Phutthabat branch, Phra Phutthabat District, Saraburi

฿206M

Project value

Treatment capacity

50,000 m

Pipe transmission

700 mm

Largest pipe

the challenge

A treatment-process upgrade — the existing plant had to be fully understood before the new system could be sequenced without interrupting service.

what we delivered

Replacement of the existing treatment process, plus transmission and distribution mains and community tie-ins for more efficient supply.

how it was built

From process upgrade through mains and meter connections — open-cut, HDD, pipe jacking and cathodic protection — plus four staff houses (two- and four-family).

Impact

More efficient distribution across parts of Saraburi including Na Phra Lan, Phra Phutthabat and Nong Don.

1,500 m³ clear-water reservoir under construction

Two-family staff housing

Four-family staff housing

Filter house upgrade

©2026 Dynamic Group Products

02-521-5611

info@dynamicgroup.co.th

©2026 Dynamic Group Products

02-521-5611

info@dynamicgroup.co.th

©2026 Dynamic Group Products

02-521-5611

info@dynamicgroup.co.th