2013-2015

PWA

Chiang Mai Project

Water supply expansion, PWA Chiang Mai branch — raw-water pumping and treatment systems, Mueang District, Chiang Mai

฿983M

Project value

48,000 m³/day

Treatment capacity

35,878 m

Pipe transmission

1,000 mm

Largest pipe

the challenge

Upgrade the existing plant and expand production to keep pace with rising annual demand under PWA’s plan.

what we delivered

Mae Tae raw-water station, Mae Faek treatment works at 48,000 m³/day, and 35,878 m of water mains.

how it was built

Pipe installed by HDD, pipe jacking and open-cut, with mechanical, electrical, chemical dosing and remote-control systems.

Impact

Enough added capacity to meet demand, with higher treatment quality from the upgraded plant.

Water treatment system testing

Sedimentation tank construction

Grit chamber construction

Site pipework installation

©2026 Dynamic Group Products

02-521-5611

info@dynamicgroup.co.th

©2026 Dynamic Group Products

02-521-5611

info@dynamicgroup.co.th

©2026 Dynamic Group Products

02-521-5611

info@dynamicgroup.co.th