2011-2013
PWA
Suphanburi Project
Water supply expansion, PWA Suphanburi branch, Mueang District, Suphanburi
฿340M
Project value
24,000 m³/day
Treatment capacity
31 km
Pipe transmission
700 mm
Largest pipe
the challenge
Urban growth in Suphanburi raised household demand. Production had to expand and water quality improve in time for that growth.
what we delivered
A 24,000 m³/day plant at Wang Yang, a 10,000 m³ reservoir, a 500 m³ elevated tower, existing-plant upgrade, plus mechanical, electrical and control works.
how it was built
Pipe by HDD, pipe jacking and open-cut over 31 km — 14 km HDPE, 1 km steel, 2 km GRP, 13 km PVC and 1 km A/C.
Impact
Enough production capacity for demand, with stronger household water security.